Things are moving right along!
The Windows Are In!
Our Beautiful Windows are going in!
The New Steeples Are Up!
What a beautiful day! Jan 18, 2017 the crews began work around 8am. The day started out dreary and overcast, but the Lord smiled down on us with glorious sunshine and perfect temperatures. What a thrill to watch the crews working putting up both steeples up. The day culminated with Bro. Jerrell and Kenneth Wilkinson assisting in putting the cross on the steeple of the new building. Bro. Jerrell prayed over the building, asking God to bless the church and most importantly, thanking God for the mighty works He has done and continues to do at Tates Creek! To God Be The Glory!
Progress Update 18
Bridge to the original building
Interior "bones" and exterior walls
Progress Update 17 - Framing
More Progress
Progress Update 16 - Beams!
Progress update 15
Progress update 14 - Elevator and stairwell shafts topped out
Click on a photo to see a full-size version.
Progress update 13 - Sanctuary floor concrete pans installed
Progress update 12 - Floor joists installed
Progress update 11
First metal posts installed
Metal posts delivered
Metal fabrication progress
Steeple removal